EXCHANGERSMA Sunny Central UP · 2S / 3S
1333-2667 kVA · Project-dependent configuration · PV central inverter · three-phase
For companies and private customers. Pick-up possible.
Availability on request

TECHNICAL DOCUMENTS · SUNNY CENTRAL
SMA Sunny Central UP · 2S / 3S
1333-2667 kVA · Project-dependent configuration · PV central inverter · three-phase
EN · SCxxxxUP-2S-3S-DS-en-13
The documented versions and service conditions can be found in the linked original document. Ask the appropriate device type and the specific configuration personally.
The manufacturer sheet names SC xxxx UP (2S) and SC xxxx UP (3S) with variable performance ranges. There is no fixed model/kW pairing for this. Match stack, mains voltage and operating point using the original sheet.
Availability on request. The assigned original data sheet and the specific device design are decisive.
Technical specifications and selection
- Equipment type
- PV central inverter
- Grid connection
- three-phase
- Performance information according to the document
- 1333-2667 kVA · project-dependent configuration
- Document version
- EN · SCxxxxUP-2S-3S-DS-en-13
PV input power, AC nominal power and apparent power are different sizes. Compare the complete manufacturer's documentation of the specific device design. Battery compatibility, replacement current function and necessary accessories must be tested for the planned system.